Sha7 Posted February 22, 2008 Posted February 22, 2008 Found some details about proposed expressways of Sri Lanka. No Idea about the timeline of these projects. However here they are for your attention. Colombo Katunayake Expressway INTERCHANGES : New Kelani Bridge Interchange Peliyagoda Interchange Kerawalapitiya Interchange (connect with Outer Circular Highway) Ja-Ela Interchange Katunayake Interchange DESIGN DETAILSSpeed Limit: 0 to 8 Km - 80 Km/h 8 - 25 Km -110 Km/h Length of Road: 25.1Km Width of Carriageway: 25.4m Number of Lanes: 4 Southern Expressway INTERCHANGES Kottawa (23rd km of the High level road) Kahatuduwa (19th km of the Colombo Horana Road) Gelanigama (12th km of the Panadura Nambapana Rathnapura Road) Dodangoda (08th km of the Nagoda - Matugama Road) Welipanna (43rd km of the Horana Anguruwathota Aluthgama Road) Kurundugahetekma (13th km of the Ambalangoda – Elpitiya Road) Baddegama (12th km of the Hikaduwa- Badegama- Nilhena Road) Pinnaduwa (Near 06th km of the Galle – Udugama Road) Deegoda (16th km of the Galle – Deniyaya Road) Kokmaduwa (07th km of the Weligama – Kananke Road) Godagama (04th km of the Matara – Akuressa Road) DESIGN DETAILSTotal Length - Kottawa to MAtara - 126 km / Galle fort access - 4.9 km Design Speed - 120 km/hr Stage I - Kottawa to Dodangoda - 4 lane / Dodangodato Godagama - 2 lane Final Stage - Kattawa to Matara widening of 6 lanes Colombo Kandy Highway DESIGN DETAILS Design Speed - 100 Km/Hour up to Devalegama / 80 Km/Hour from Devalegama to Katugastota Length - 98 km No.of Lanes - Kadawata to Ambepussa – 4 Lanes (with provision for 6 lanes in future) Ambepussa to Devalegama – 2 Lanes ( with provision for 4 lanes in future) Devalegama to Katugastota – 2 Lanes Outer Circular Highway INTERCHANGES Kerawalapitiya with Colombo - Katunayake Expressway Mattumagala with Peliyagoda - Puttalam Road Kadawatha with Colombo Kandy (A1) Road & proposed Colombo Kandy Expressway West of Biyagama Town with Kelaniya - Mudungoda Road West of Kaduwela Town with Colombo - Hanwella Low Level Road Makumbura (Kottawa) with Colombo - Ratnapura (A4) Road and proposed Southern Expressway DESIGN DETAILSLength - 28km Traffic Lane - 3.5m Shoulder - 3.0m Median - 4.5m Design Speed - 80km/h Initial Stage - 4 lanes Ultimate Stage - 6 lanes Quote
pissa Posted February 22, 2008 Posted February 22, 2008 not bad...looks good on paper...let's hope things work out well. doesn't have much of a chance with all the corruption etc in the country....imagine 2 years down the line, i'm sure there will be road side tea shops and pavement vendors along the highways!!! and our very "disciplined" drivers doing U-turns and what not in the middle of the road... ...120km/h limit is faster than the speed limits on US highways!! which is around 65mph.....interesting... the southern express way is terminating at kottawa!...so all the vehicles will be traveling down high-level road.....not good, considering it's a traffic nightmare as it is.... Quote
Sha7 Posted February 22, 2008 Author Posted February 22, 2008 (edited) the southern express way is terminating at kottawa!...so all the vehicles will be traveling down high-level road.....not good, considering it's a traffic nightmare as it is.... Adding a little clarification: Southern expressway won’t be terminating at Kottawa. There it will join the Outer Circular Highway which join all 3 Highways together. Edited February 22, 2008 by Sha7 Quote
xXx Posted February 22, 2008 Posted February 22, 2008 wasn't this proposed donkey's years ago. i think it was during chandika's regime that they drew the plans for this. (or was it a different 'expressway') what happened to the one that started work in the same era where they had to pump lot of sad??? Quote
GTAm Posted February 22, 2008 Posted February 22, 2008 Any idea of the costs? And how is the government going to fund it? Quote
Arc Angel Posted February 22, 2008 Posted February 22, 2008 well, if they do eventually get built, they'll make mighty fine drag strips Quote
The Don Posted February 22, 2008 Posted February 22, 2008 I think the first phase of the southern expressway was supposed to be completed by August 2006. Sadly I have not been back home since April 2006 so could somebody confirm this is the case and the second phase has begun. Quote
GuruG Posted February 22, 2008 Posted February 22, 2008 I just wish at least 1 of em will be completed b4 I die old. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.