Jump to content

Project Moggie - Body & Electrical work


kusumsiri

13,361 views

Bodywork started after disassembling almost all parts. Remain only the outer shell of the car with wiring harness which can not pullout easily. Gauge 14 & 18 zinc coated metal sheets used for most places.

1.thumb.jpg.40b2699650b77bbcb307c01c43095c15.jpg2.thumb.jpg.13911513b63900f369e0dd1829dbcfd7.jpg

Firstly cut the right side of the chassis and welded new bar.

3.thumb.jpg.d40946ca58ed476765dc2d51e944ee8b.jpg4.thumb.jpg.1ef6cdb65511029e296d6dcad44bd8e2.jpg5.thumb.jpg.21268028b2994faeca970e6213a96aa2.jpg6.thumb.jpg.3d3750fdf6fd4a6a82933757837c27a9.jpg

Then the left side and floor board plates one by one. All door bottoms, front and back wings repaired. Mean time door hinge pins refilled at a lathe workshop.  Finally attached all doors and wings again to check the aligning.

7.thumb.jpg.3dfebf1883dc9cd8b89ee58b4f8d5a42.jpg

Carbide 9kg and a oxygen cylinder consumed for this works.

  • Like 3

27 Comments


Recommended Comments



Mr. Kusumsiri,

Thank you for your invitation I will visit as early as possible. I will not spend much time with you as I want to visit Sevanagala  sugar factory to recollect my memories. I  did most of factory rectification on their Electrical wiring system. Due to our contractor very old  company, who undertook to do entire job did not complete same satisfactory. Indian principal contractor  Cromton Greeves wanted me to complete mill house final sugar manufacturing section and Distillery.

Sylvi.                                                                    

  • Like 1
Link to comment

Guest
Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

AutoLanka Cars For Sale

Post Your Ad Free [Click Here]



×
×
  • Create New...