NRX Posted August 10, 2015 Posted August 10, 2015 From what I heard Elections Commissioner had issued an order to invite MR to the opening ceremony if it's opened before the election (since he started the project and doing so without him gives the govt unfair advantage or whatever). I guess this could be a reason. Fair enough! Quote
B2Spirit Posted August 10, 2015 Posted August 10, 2015 (edited) What can't these people put a news item on all major channels in the evening news bulletins with guidance as to how the new section will change or enable new traffic flows and just open the route at midnight. Why do we need so much fanfare for opening a phase of the project. I can understand the hoopla over a new project like kandy or nothern, But having opening ceremonies for extensions or phases is absurd. Edited August 10, 2015 by B2Spirit 2 Quote
isam Posted August 21, 2015 Posted August 21, 2015 Any idea on when they are going to open the Athurigiriya entrance? Construction seems to be completed. Quote
B2Spirit Posted September 8, 2015 Posted September 8, 2015 Elections over and life moves on. Have they forgotten to open the highway extensions Quote
ramishkad Posted September 13, 2015 Posted September 13, 2015 Second phase of Sri Lanka's Outer Circular Highway to be opened on September 17 Sat, Sep 12, 2015, 11:02 am SL Time, ColomboPage News Desk, Sri Lanka. Sept 12, Colombo: The second stage of the Outer Circular Highway (OCH) from Kaduwela to Kadawatha will be vested with the public on the 17th of this month under the patronage of Highways Minister Lakshman Kiriella. Project Direct S S H Abeywickrama told the national radio that the vehicles will be able to ply on the highway segment from 6.00 AM of Friday (18th). Construction of the second phase of the OCH, the 9-kilometer segment from Kaduwela to Kadawatha began in 2012. The 4-lane expressway with the total length of 14.36 kilometers cost Rs. 44.88 billion rupees. The Japan International Cooperation Agency has funded the project. The cost included construction of five overpass bridges and the 250 meters long 6-lane bridge over the Kelani River. The 4-lane expressway is to have 3 toll office buildings and 6 toll plazas. The OCH is expected to provide an effective bypass for North-South bound traffic and to reduce through-traffic in the city of Colombo and minimize traffic congestion. The OCH will connect the Southern Expressway with the Central/Northern Expressway. Source : http://www.colombopage.com/archive_15B/Sep12_1442035979CH.php 1 Quote
Pericles Posted September 13, 2015 Posted September 13, 2015 Second phase of Sri Lanka's Outer Circular Highway to be opened on September 17Sat, Sep 12, 2015, 11:02 am SL Time, ColomboPage News Desk, Sri Lanka. Sept 12, Colombo: The second stage of the Outer Circular Highway (OCH) from Kaduwela to Kadawatha will be vested with the public on the 17th of this month under the patronage of Highways Minister Lakshman Kiriella. Project Direct S S H Abeywickrama told the national radio that the vehicles will be able to ply on the highway segment from 6.00 AM of Friday (18th). Construction of the second phase of the OCH, the 9-kilometer segment from Kaduwela to Kadawatha began in 2012. The 4-lane expressway with the total length of 14.36 kilometers cost Rs. 44.88 billion rupees. The Japan International Cooperation Agency has funded the project. The cost included construction of five overpass bridges and the 250 meters long 6-lane bridge over the Kelani River. The 4-lane expressway is to have 3 toll office buildings and 6 toll plazas. The OCH is expected to provide an effective bypass for North-South bound traffic and to reduce through-traffic in the city of Colombo and minimize traffic congestion. The OCH will connect the Southern Expressway with the Central/Northern Expressway. Source : http://www.colombopage.com/archive_15B/Sep12_1442035979CH.php 9km - 14km... Don't these newspapers have fact checkers? Quote
maersk Posted September 16, 2015 Posted September 16, 2015 Are toll gates ready? Ready, long time already Quote
Seeker LK Posted September 18, 2015 Posted September 18, 2015 The Kadawatha- Kaduwela segment of the Colombo Outer Circular Expressway was declared open a short while ago by Minister of Highways Lakshman Kiriella. The Expressway will be open to the public after 9 pm today (17), the Ministry of Highways said. A toll of Rs. 100 will be charged from light vehicles that travel from Kadawatha to Kaduwela on the Expressway while Rs. 200 will be charged from heavy vehicles. Rs. 650 will be charged from light vehicles travelling from Kadawatha to Matara and Rs. 1,750 will be charged from heavy vehicles including busses. The toll charge from Kadawatha to Pinnaduwa is Rs. 500 for light vehicles. Bus fare is Rs. 400 per person to Galle from Kadawatha while Rs. 500 will be charged from passengers to Matara. Bus service will be available from 8.30 in the morning to 4.30 in the evening for passengers travelling to Matara. Bus service for passengers travelling to Galle will be available from 7.00 a.m. to 3.00 p.m. daily. - Copied from : http://www.dailymirror.lk/87775/kadawatha-kaduwela-expressway-opened#sthash.AsTEl5ch.dpuf Quote
Rumesh88 Posted September 18, 2015 Posted September 18, 2015 When you say "Kaduwela" is it the existing Kothalawala entry/exit or is there a entry/exit from Low Level Road? I'm a bit confused. However, I will be taking OCH tonight to get to Kadawatha. Quote
NRX Posted September 18, 2015 Posted September 18, 2015 When you say "Kaduwela" is it the existing Kothalawala entry/exit or is there a entry/exit from Low Level Road? I'm a bit confused. However, I will be taking OCH tonight to get to Kadawatha. There is an entry/exit from Low level as well as Biyagama road. Google maps is updated already https://www.google.com/maps/place/Kadawatha,+Sri+Lanka/@6.9377978,79.9723346,17z/data=!4m2!3m1!1s0x3ae2f86bd75870f7:0xee362e29dbc079a6 Quote
B2Spirit Posted September 18, 2015 Posted September 18, 2015 (edited) When you say "Kaduwela" is it the existing Kothalawala entry/exit or is there a entry/exit from Low Level Road? I'm a bit confused. However, I will be taking OCH tonight to get to Kadawatha. used the Low Level exit today morning. The charge was same as the kothalawa exit. if you are to go to kadawatha you have to use the Low level interchange anyway as kothalawala doesn't have an entry towards kadawatha Edited September 18, 2015 by B2Spirit Quote
NRX Posted September 18, 2015 Posted September 18, 2015 BTW, it was funny seeing the "samaru palakaya" 1 Quote
tux Posted September 18, 2015 Posted September 18, 2015 According to google maps, seems when coming from Kadawatha side it's not possible to exit in kothalawala. Is this correct? Quote
Rumesh88 Posted September 18, 2015 Posted September 18, 2015 (edited) According to google maps, seems when coming from Kadawatha side it's not possible to exit in kothalawala. Is this correct? Exactly! According to the map you do not find proper entry/exit points at some places. At Biyagama road you can enter towards Kadawatha and exit coming from Kawawatha but you cannot enter or exit towards/from Matara. At Low Level Road and Kothalawala it is other way round. But at Athurugiriya you get proper clover leaf arrangement and universal entry exit. Well Roads and Highways should print a user manual for the road now Edit: Sorry it should be read as "University and Highways" now. Edited September 18, 2015 by Rumesh88 Quote
B2Spirit Posted September 18, 2015 Posted September 18, 2015 According to google maps, seems when coming from Kadawatha side it's not possible to exit in kothalawala. Is this correct? Kothalawala only has 1 exit and 1 entry. Exit is for vehicles coming from matara and the entrance is for vehicles going to matara. The Low level interchange had the proper 4 way arrangement as far as i saw. Quote
tux Posted September 18, 2015 Posted September 18, 2015 (edited) This is probably because they do not want vehicles to enter from biyagama and exit from kothalawala as it's just about a 1km and they cannot charge toll for such small distance. However then OCH will not help easing traffic in kaduwela junction as everyone still need to pass kaduwela junction when going to battaramulla direction. If there was a 4 way exit in kothalawala, vehicles can completely bypass kaduwela when travelling from biyagama. Edited September 18, 2015 by tux Quote
fiat fan Posted November 9, 2020 Posted November 9, 2020 (edited) Sorry for bringing up this thread. But whatβs Β the bridge being built near Peliyagoda? The news channel camera guy was too busy recording the presenters face while they explained the map. Anybody got any news?Β Β Also a map of ALL highways and OCH would be greatly appreciated! Edited November 9, 2020 by fiat fan Pressed save accidentally Quote
gayanath Posted November 10, 2020 Posted November 10, 2020 5 hours ago, fiat fan said: Sorry for bringing up this thread. But whatβs Β the bridge being built near Peliyagoda? The news channel camera guy was too busy recording the presenters face while they explained the map. Anybody got any news?Β Β Also a map of ALL highways and OCH would be greatly appreciated! Katunayaka expressway will be connected to the new bridge and it will then connected to Port city expressway and kaduwela expressway at the junction near Kalanithissa power plant.Β Β https://openjicareport.jica.go.jp/pdf/12145447_01.pdf 1 Quote
Devinda_Z Posted November 12, 2020 Posted November 12, 2020 On 11/10/2020 at 4:45 AM, fiat fan said: Sorry for bringing up this thread. But whatβs Β the bridge being built near Peliyagoda? The news channel camera guy was too busy recording the presenters face while they explained the map. Anybody got any news?Β Β Also a map of ALL highways and OCH would be greatly appreciated! @fiat fan Β 1 Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.